Live Event Production

the show is on

Vision Accomplished: Inside Fanatics Fest NYC on Game Day — What Happens When the LED Walls Come Alive

Part 3 of 3 | Vision Accomplished ← Part 1: The Empty Floor  | Part 2: Taking Shape  → Three days before the World Cup Final. The truss was in the air. The panels were live. The processing was clean. The production control room was staffed and running feeds. And then 150,000 fans walked through...

Read More Read More
A massive curved LED wall running a white diagonal stripe test pattern, filling the full frame, visibly bowing left to right.

What Happens Before 150,000 Fans Walk Into a World Cup Event

Part 2 of 3 | Taking Shape ← Part 1: The Empty Floor  ·  Part 3: Vision Accomplished (coming soon) → There’s a moment in every large event build that nobody photographs. Not because it isn’t important — it’s arguably the most important moment of the entire production. But because it doesn’t look dramatic. No...

Read More Read More